|
|
 |
 |
 |
|
|
Year
2006-2011
Employer
Ministry of Infrastructure, Transport and Networks / EYDE THESSALONIKIS
|
|
|
|
| |
WATER TREATMENT PLANT OF THESSALONIKI (PHASE A2)
|
|
|
|
| |
Water Treatment Plant of Thessaloniki 150.000m3/d · Power station · Power distribution· Design of primary sendimentation · Design of water filtering with sand and ozon production and distrubition· Design of the automation system and incorporation into it the existing one · Instrumentation design.
|
|
| |
|
|
|
|
|
|
 |
|
© Copyright 2026. TEAM E-M Consulting Engineers |
|