Year
2019-2021
Employer
COSMOTE S.A.
|
|
|
|
| |
RENOVATION OF DATA CENTERS AT COSMOTE YMA - NYMA COMPLEX
|
|
|
|
| |
Renovation of energy infrastructure networks of various Data Centers at COSMOTE YMA-NYMA Complex including:
• Consulting services: Energy study, Technical & Economical Feasibility study for future expansion of Data Center, Complete design of E/M services including permitting, Tender documents, Construction Supervision, TIER Classification consultancy according to UPTIME INSTITUT • Short description: Electrical installations: 2+2 transformers x 2.00KVA, 2+1 generators x 2.250KVA, 2 UPS x 1.250 KVA, New Low Voltage Switchgear, New Low Voltage Distribution with Bus Ducts, Renovation of PLC control system, Room Conditions detection system (water leakage, temperature), Air conditioning of transformers rooms, Firefighting systems (NOVEC, AEROZOL). Cooling installation: 2+1 Air Cooled Chillers x 750kW, New Cooling Pipe Distribution Loop, Installation of water Close Control Units, Water leakage detection system.
|
|
| |
|
|
|
|
|
|
 |
|